Curriculum Vitae In Detail
Positions Held:-
From 16th September 2002: Independent
Consulting Engineer
Specialising in all aspects of movable structures. Commissions so far obtained include:-
·
Supervision of annual maintenance for St
Mary’s Island Lift Bridge, Chatham.
·
Included in a team for the design
competition for Stack A bridge Dublin.
·
Included in a team for the design
competition for new opening bridge Poole.
·
Troubleshooting on two movable bridges
for Network Rail (formerly Railtrack)
April 1996- 14th September 2002: M G Bennett & Associates Ltd
Associate Director
Specialised in the structural, mechanical, power hydraulic, electrical power and control aspects of movable bridges. including:-
·
Inspection, assessment investigation and
fault finding
·
Feasibility studies, conceptual design
and preparation of tender submissions
·
Detailed design and preparation of
contract documentation
·
Supervision of manufacture, construction
and commissioning
·
Writing of maintenance manuals and
training
·
Letting and supervision of maintenance
contracts
·
Expert witness services
·
Baltic Millennium Bridge Gateshead,
preparation of performance specification for the mechanical, hydraulic and
electrical equipment, supervision of design including hydraulic and structural
dynamic computer modelling, supervision of commissioning.
·
Lowry Centre Lift Bridge, Salford, 90
metre long lifting footbridge that raises 18 metres vertically, detailed design
and supervision of machinery and control system.

·
Falkirk Wheel, design of hydraulic
circuit for main rotation drive.
·
Great Wharf Road Bridge, Canary Wharf,
innovative highway lift bridge. Exemplar design and preparation of performance
and workmanship specification.
·
Bellmouth Passage Swing Bridges, Canary Wharf,
pedestrian swing bridges connecting multi-storey buildings. Conceptual
design
·
Forton Lake Lift Bridge, Gosport, devised
the concept based on the Belidor Principle and carried out fully detailed
design of the machinery and control system; this bridge won the Institution of
Civil Engineers Southern Counties Award.

·
Inre Hamnen Swing Bridge, Malmo Sweden,
long span asymmetric highway swing bridge with hydraulic pintle, preparation of
exemplar design and specification.
·
Chamberlain Bridge, Bridgetown Barbados,
plastic composite single leaf highway bascule bridge, fully detailed design of
machinery and control system.
·
River Yeo Swing Bridge, fully detailed
design of machinery and control system for this bridge, which has a hydraulic
pintle and is remotely operated using the telephone and CCTV systems.


·
Glasgow Science Centre Lifting
Footbridge, double leaf pedestrian bascule bridge with innovative radio
controlled control system. Complete service from feasibility to commissioning.
·
Bridge of Scottish Invention, Irvine
Scotland, sliding footbridge, full service from feasibility to commissioning.
·
Sammy’s Point Swing Bridge, Kingston Upon
Hull, foot and cycle bridge for The Deep Millennium Project. Exemplar design
and preparation of contract documentation to JCT forms.
·
Pembroke Ferry Terminal, design and
commissioning of hydraulic and electrical control equipment for new roll-on
roll-off ramp.
·
Red Road Bridge, St Katharine Docks,
investigation of bearing failure and design of new lifting mechanism.
·
St Katharine Docks, design and
commissioning of new centralised control system and hydraulic equipment for
four movable bridges, two lock gates and penstocks.
·
Feasibility studies for four movable
bridges of various types in Eire.
·
Selby By-pass Swing Bridge, design and
construction phase advice for Highways Agency.
·
King George Dock Hull Riverside Berth,
investigation of pedestrian ramp machinery and control systems.
·
Leamington Lift Bridge, Edinburgh,
originally constructed in 1906, this vertical lift bridge fell out of use in
the late 1950’s and has been fully re-furbished with a new hydraulically
operated lifting mechanism. Preparation of exemplar design and contract
documents. Writing of PLC logic software. Supervision of commissioning.
·
Millennium Link Bridges, Forth &
Clyde Canal, fully detailed design of all aspects:-
o
Erskine Ferry Road Swing Bridge, restored
after 40 years of disuse.
o
Hillhead Swing Bridge, restored after 40
years of disuse.
o
Sylvania Way Vertical Lift Foot Bridges,
Clydebank Shopping Centre, two innovative hydraulically operated lift bridges.
o
Twechar Tilting Lift Bridge, highway
bridge of steel battle deck construction.
o
Bonny Bridge Lift Bridge, highway bridge
in reinforced concrete with innovative hydraulic lifting system.
·
Writing of a standard specification for
the design and construction of movable bridges for internal use.
·
Particular interest in the design of
heavily loaded bearings and other components which are subject to marginal
lubrication due to high contact pressures.
·
Phai Lai 2 power station in Vietnam for
Mitsui Babcock Energy, structural design audit of boiler house and coal
bunkers.
·
Drax Power Station, investigation &
feasibility study for the removal of coal tramp including specification of
magnetic separators, screens and associated conveyors for proposed new
screening plant.
·
BSC Stocksbridge, investigation of
stanchion mounted jib crane and structural assessment of mill building
steelwork.
·
Design of power and control system for
molten metal ladle transfer bogie used in production of ductile iron cast
pipes.
·
Independent technical assessment of
hydraulic system for reactor load follower for Devonport Dockyard.
·
Expert witness work related to industrial
robots, accident with a reclining chair, pipe joint failure.
·
Investigation of specification of plant
for thermal power stations for Mitsui Babcock.
·
Specification of pumps, design of
pipelines and electrical control equipment for storm water pumping station at
Thorne with 3 X 135 kW + 2 X 15kW
pumps.
January 1989- March 1996:
Waterman BBT, Consulting Engineers -
Associate, Power Engineering Department.
·
Bramwith & Godnow Swing Bridges,
Wrenbury Lift Bridge, detailed design of all mechanical, hydraulic and
electrical equipment, category 3 structural check
·
Sheffield & South Yorkshire Bridges-
Conversion to user operation of six bridges, including Wykewell Bascule Bridge,
Thorne.
·
Moores Bridge, Thorne, conversion of
manually operated 100-year-old swing bridge to power operated user operation. Design and supervision including re-painting
works.
·
Connaught Crossing Swing Footbridge,
double leaf asymmetric swing footbridge. Design of mechanical and control
equipment, detailing of structural steelwork. Commissioning.
·
Herons Quay Bascule Bridge, Canary Wharf.
Supervision of design, manufacture and erection of machinery.
·
St Mary’s Island Lift Bridge, Chatham,
design of mechanical, hydraulic and electrical equipment, planning of
manufacture and detailing of structural steelwork. Supervision of erection and
commissioning.

·
St Katharine Docks, inspection and
assessment of machinery and electrical equipment for the Red Road Bridge and
Lock Gates.
·
Supporting steelwork for the Drax FGD
plant for Babcock Energy - responsible for managing all resources, programming,
design change control, quality assurance and contractual matters, including
contract negotiation. This was a
retrofit contract for the design of 23,000 tonnes of steelwork involving
complex temporary and erection conditions and extensive co-ordination with
other disciplines.
·
The design of thermal power station
projects (of various sizes) principally on behalf of Babcock Energy and GEC
Alsthom. This encompassed the design of
conveyor structures, junction towers, coal bunkers, boiler support steelwork,
flues, conveyors, hot steelwork and steel chimneys.
·
Application of modern computer methods
and codes of practice to the design of process plant structures. This work was used in the design of the
boiler support steelwork for eight Combined Cycle Gas Turbine power plants.
·
Expert witness work on two cases both
related to mechanical handling plant; these both involved detailed
investigative work including the interviewing of witnesses and literature
reviews.
September 1979- December 1988:
British Waterways, Technical Services Department, Leeds - Movable
Bridge Engineer.
April 1978- August 1979:
Dow Mac Concrete Ltd, Tallington, Lincolnshire - Design Office Team
Leader.
August 1977-March 1978:
Wakefield & Imberg, Stamford, Lincolnshire - Design Engineer.
September 1974-August 1977:
University of Newcastle-upon-Tyne.
PhD Civil Engineering.
Thesis title: "Optimum Design of
Multi-Storey Steel Structures".
August 1972 - August1974:
Alan Wood & Partners, Kingston-upon-Hull - Graduate Engineer.